How To Use PEPPER®
Start Up
Step 1: Vacuum, Clean & Balance Pool
Water Balance Parameters
pH 7.2-7.6
TA 80-120ppm
CH 250-400ppm
CYA 30-80ppm
FC 1.5-3.0ppm
TC 1.5-3.0ppm
Note: for required salt levels, refer to your specific generator instructions
Step 2:
Initial Dose:
Add 1 lb. PEPPER® per 10,000 gallons
Note: Add PEPPER® directly in front of pool jet or broadcast over pool surface with pump running
Normal Dose:
Every 2 weeks while pool is open:
Add 1/2 lb. PEPPER® per 10,000 gallons
Step 3: Test & Adjust
Test chlorine level after 7 days and adjust generator as needed.
Note: You will find that most generators can be operated at lower settings with continued use of PEPPER®
TIPS
-
It's always best to inspect your salt cell prior to starting the PEPPER® program, clean it if necessary. Checking output is especially important on pools with automatic covers.
-
PEPPER® is ideal for covered pools and will help to cut down the amount of chemical related problems associated with covered pools.
-
For best results, test chlorine levels weekly for the first month and adjust ECG as necessary.
-
Optimizing the system performance has allowed many of our customers to decrease system output by about 20%.